New Pipeline Interference Standard being Chaired by Ken Lax

Ken Lax (Technical Director) will be chairing the ISO Technical Committee 67 Sub Committee 2 Working Group 24 (TC67 SC2 WG24) committee drafting the new ISO stray current standard at BSI offices in London from 15 to 17 August 2017.

The new standard will cover all aspects of electrical interference on pipelines.

This new standard will be ISO 21857 and will include the effects of space weather (tellurics), varying DC from traction systems, steady state DC from CP systems, and induced AC.

Induced AC is already covered in detail in another ISO standard and this new standard will provide an introduction and some additional information on AC corrosion.

Delegates from more than 15 countries will participate in the drafting process.

 
ISO.png
 

L'énoncé de capacité de l'entreprise est maintenant disponible en Français

Notre dernière déclaration de capacité d'entreprise est disponible en français.

Le document comprend notre liste complète de services, les secteurs dans lesquels nous opérons et ce qui nous distingue de nos concurrents.

Une liste des principales expériences récentes au cours des trois dernières années est également fournie pour illustrer certains des travaux auxquels nous avons participé.

Pour une liste de projets plus complète, pour les 3 dernières années et au-delà, n'hésitez pas à nous contacter.

 
Corroconsult UK Limited - Capability Statement [French] resized.png
 

Declaración de capacidad de la empresa ahora disponible en Español

Nuestra última declaración de capacidad de la empresa está disponible en español.

El documento incluye nuestra lista completa de servicios, los sectores en los que operamos y lo que nos diferencia de nuestros competidores.

También se proporciona una lista de experiencias clave recientes durante los últimos 3 años para demostrar parte del trabajo del proyecto en el que hemos participado.

Para obtener una lista de proyectos más completa, durante los últimos 3 años y más, no dude en contactarnos.

 
Corroconsult UK Limited - Capability Statement [Spanish] resized.png
 

Declaração de capacidade da empresa agora disponível em Português

Nossa mais recente Declaração de capacidade da empresa está disponível em Português.

O documento inclui nossa lista completa de serviços, os setores em que atuamos e o que nos distingue dos nossos concorrentes.

Uma lista de experiência chave recente nos últimos 3 anos também é fornecida para demonstrar algum trabalho do projeto com o qual estávamos envolvidos.

Para uma lista de projetos mais abrangente, nos últimos 3 anos e além, não hesite em contactar-nos

 
Corroconsult UK Limited - Capability Statement [Portuguese] resized.png
 

بيان قدرة الشركة متوفر الآن باللغة العربية

أحدث وثائقنا التي توضح بالتفصيل قدرات شركتنا متوفرة باللغة العربية

تتضمن الوثيقة قائمتنا الكاملة من الخدمات والقطاعات التي نعمل فيها وما يميزنا عن منافسينا.

كما تم تقديم قائمة بالخبرات الأساسية للسنوات الثلاث الماضية لإظهار بعض أعمال المشروع التي شاركنا فيها.

للحصول على قائمة أكثر شمولاً بالمشروعات ، على مدى السنوات الثلاث الماضية وما بعدها ، لا تتردد في الاتصال بنا

 
Corroconsult UK Limited Capability Statement [Arabic] resized.png
 

Company Capability Statement Released

Our latest Company Capability Statement is available in English.

The document includes our full list of services, the sectors in which we operate and what sets us apart from our competitors.

A list of recent key experience within the last 3 years is also provided to demonstrate some of the project work we have been involved with.

For a more comprehensive project list, for the past 3 years and beyond, please do not hesitate to contact us.

Cluden to Brighouse Bay Pipeline Project

cluden1.jpg
cluden2.jpg

Corroconsult have commenced their supervisory and consultancy role on behalf of Arup for the Cluden - Brighouse Bay Pipeline Project in Scotland, UK.

The project is to construct a 50km high-pressure steel pipeline between Cluden and Brighouse Bay in Scotland, including a 7.5km re-route of the pipeline between Cluden and Lochfoot.

cluden3.jpg

This is the final step to complete the full twinning of the two gas interconnectors between Ireland and the UK. Twinning of the on-shore section, which feeds the 2 subsea pipelines in place since 1993 and 2004 respectively, will secure this vital link to the UK gas market.

The pipeline will also boost the operational flexibility of the Irish gas network which is essential to providing backup to intermittent renewable electricity generation. Natural gas, as the cleanest and most flexible fossil fuel for power generation, is an ideal partner to renewables as Ireland seeks to meet its energy and climate change targets.

The pipeline will be constructed using 900mm diameter high-grade steel pipe, buried to a minimum of 1.2 m below ground. Pipeline construction activities are being supervised by Arup and the main construction works are being undertaken by Sicim Roadbridge on behalf of GNI (UK) Limited.

 

 

New ISO Accrediation Achieved

 
 

As with the original ISO 9001 and 14001 Standards, Corroconsult have become among the first corrosion control companies to achieve the new ISO 9001:2015 and 14001:2015 Standards for our Quality and Environmental Management Systems.

We also remain accredited to OHSAS 18001:2007 Standard for our Health & Safety Management System.

Note:

For copies of the latest certificates (following our most recent audit in February 2018) please click the following links;